AfterWhat a Tub-to-Shower Conversion Costs in Miami Beach, FL
A tub-to-shower conversion in Miami Beach runs $4,130-$11,800 for a standard alcove swap, and $10,620-$33,040 for a full bathroom remodel that folds the conversion in. The number that catches people off guard isn’t the tile or the fixtures. It’s the mortar bed under the old tub – a masonry demo step that adds $600-$1,400 in this city and rarely shows up in a verbal estimate. Call (844) 656-1986 and we’ll put the whole thing in writing before anyone swings a hammer.


The problem nobody prices: what’s under your tub in Miami Beach
Most of Miami Beach’s mid-rise condos went up between the 1950s and the 1970s, and the tubs in those units weren’t dropped into a wood-frame floor. They were set into a 3-4 inch mortar bed poured against the slab or into the coral rock footing below. That bed is structural in its own quiet way, it was never designed to drain, and it has to come out completely before a new shower pan can be sloped correctly.
We can’t just tile over it. A shower needs a slope of roughly a quarter inch per foot toward the drain, and the old tub bed has no slope at all. Skim-coating it or building a curb on top leaves you with standing water and a callback in eight months. So the bed comes out, the cavity gets prepped, and a new sloped pan gets poured.
That’s where the $600-$1,400 difference lives. On a wood-frame bathroom on the mainland, the demo is lighter and the framing is right there. In a Miami Beach masonry building, it’s jackhammer work, hauling, and a fresh mortar pour. Every conversion we quote shows it as its own line item, in writing, before the tub is touched. If you want to see how this fits into a larger project, our Bathroom Remodeling page lays out the full scope.
What you’ll actually see when the floor opens up
On ground-floor and podium-level units – anything sitting close to grade on the bay or ocean side – a demo crew can hit standing water in the slab cavity. It happens more than people expect, especially in the fall. If your unit is one of them, we stop, photograph it, and tell you what it means before going further. That’s the honest version of a demo-day surprise.
Why the tide calendar shapes your project schedule
Miami Beach sits on a barrier island where the ocean and Biscayne Bay meet, and the water table can rise to within inches of the slab surface during the king tide window from September through November. Contractors here already schedule foundation pours around the tides. We do the same thing with shower drain work.
That means we don’t leave an open slab penetration in a podium-level unit sitting through a king tide. We sequence the demo and the drain rough-in together, close it up, and move on. On a mainland schedule this looks like overcaution. On Miami Beach it’s the difference between a clean pour and pumping out a cavity. If you’re planning a conversion in the fall, tell us up front – we’ll map the work around the tide calendar, not just around your move-out date.
- September-November: tightest scheduling. Ground-floor and podium units get sequenced around tide peaks.
- December-April: dry season, the easiest window for demo and drain work.
- June-August: workable, but heavy summer rain can slow exterior hauling and material deliveries.
Salt air matters too. Every fixture, drain body, and fastener we set is chosen to survive it. That’s why we lean on Kohler and Moen – both hold up in coastal conditions and both carry their own manufacturer warranties layered under ours.

What drives the number up or down
The spread between a $4,130 job and a $33,040 one is almost never the shower itself. It’s what’s hiding under and behind the old alcove.
A prefab acrylic or fiberglass unit drops into a standard alcove with a new pan and minimal framing work. A tile shower with real waterproofing, a proper mortar bed removal, and Kohler or Moen fixtures sits in the middle. Custom frameless glass with a Silestone or Caesarstone surround and a linear drain is the top of the range, and it usually carries slab work and drain relocation with it.
The other variable is drain location. When the old tub drain sat at one end and the new shower drain needs to be centered, that’s a slab cut, a new trap, and a patched pour. Tile removal, plumbing age, and the state of the wall behind the surround all add or subtract. We’d rather tell you that in the written price than discover it on day three.

What a Miami Beach conversion costs, line by line
Here are the ranges we quote for Miami Beach homes. Every row assumes the substrate work is already in the price – not tacked on later.
| Item | Price Range |
|---|---|
| Tub-to-shower conversion (standard alcove) | $4,130-$11,800 |
| Walk-in shower installation | $5,310-$14,160 |
| Shower replacement | $3,540-$10,030 |
| Bathroom vanity installation | $945-$3,540 |
| Mortar bed removal and re-slope (Miami Beach masonry buildings) | $600-$1,400 add-on |
| Full bathroom remodel (conversion included) | $10,620-$33,040 |
| Small bathroom remodel | $5,900-$14,160 |
The mortar bed line is the one to watch. On a mainland conversion it doesn’t exist. On a Miami Beach conversion in a 1950s-1970s building, it’s real, and hiding it in a lump-sum bid is how contractors create the surprise on invoice day. Our quote shows it as a named line so you can see exactly what the demo involves. See the broader scope in our Bathroom Remodeling in Miami Beach page if your project goes past the shower.
How we keep the surprise out of the invoice
The Kingswell Way is simple: say the price before the work, show up in the window we gave, and leave the place cleaner than we found it. That’s a written price before any work starts – not a range, not a verbal ballpark. The number on day one is the number on the invoice.
The 365-Day Done Right Promise sits on top. If the waterproofing fails or the drain doesn’t flow right inside that year, we come back and make it right at no charge. Those are the two callbacks that make up most post-conversion complaints, and both are covered in writing before the first tile is set. If a repair ever fails, the return visit is free – no service call fee, no re-inspection charge. Our technicians carry up to 22 years of experience, they’re background-checked, and they arrive in uniform.
Materials come from brands you can look up: Kohler and Moen for fixtures, Silestone and Caesarstone for surrounds, KraftMaid and Wellborn for cabinetry. Each of those carries its own warranty layered under ours. Prefab panelized systems like those from Plant Prefab and Mighty Buildings are worth a conversation if you’re weighing speed against a site-built pan – they’re one option, and we’ll tell you when they make sense and when they don’t.
What a conversion actually involves
- Demo and mortar bed removal. The old tub comes out, the masonry bed comes out, and we inspect the cavity for moisture or slab issues.
- Drain relocation. The new drain location gets cut, trapped, and tested. Timed around the tide calendar for ground-level units.
- Sloped pan pour and waterproofing. Fresh pan, correct slope, and a waterproof membrane that ties into the walls.
- Substrate and tile. Cement board substrate (the moisture-resistant layer behind your tile) goes up, then tile, then grout.
- Fixtures and glass. Valve, trim, drain, and the glass panel or door, then a full leak and flow test.
Most standard conversions land in seven to twelve working days, longer if we’re sequencing around a king tide window or waiting on custom glass.
FAQs
A tub-to-shower conversion in Miami Beach costs $4,130-$11,800 for a standard alcove, and $10,620-$33,040 if it’s folded into a full bathroom remodel. The biggest variable is the mortar bed under the old tub, which adds $600-$1,400 in this city’s masonry buildings. Call (844) 656-1986 for a written price – the estimate is free.
Repair is cheaper in the short term but only makes sense when the pan and waterproofing are sound and the problem is a fixture or a single tile. If the pan is compromised or the mortar bed is waterlogged, repair usually fails within a year. Call (844) 656-1986 and we’ll tell you which case you’re in before you spend a dollar.
No – a proper Miami Beach conversion takes seven to twelve working days because the mortar bed has to come out, the pan has to be re-poured and sloped, and the waterproofing has to cure before tile goes down. Any contractor promising a one-day conversion in a 1950s-1970s building is skipping steps. Call (844) 656-1986 and we’ll give you a real schedule.
We come back and fix it at no charge. The 365-Day Done Right Promise covers waterproofing integrity and drain performance for a full year, and it’s in writing on every conversion. The return visit is free – no service call, no re-inspection fee. Call (844) 656-1986 and a live person answers, day or night.
Get a written number before you pull the tub
Penhallow Remodeling Miami Beach quotes tub-to-shower conversions with every line item in writing – mortar bed removal, drain relocation, re-slope, tile, and fixtures all named. Free estimate, no pressure, no pressure tactics. A real person answers (844) 656-1986 around the clock.
Written by the team at Penhallow Remodeling Miami Beach, serving Miami Beach, FL.
What Our Customers Say
"Full home refresh before we sold. They were straight about what was worth doing and what wasn't to get our money back. On time, on budget, and it sold in a week."
- Monica Vaughn"Primary bath remodel. They gave me a schedule and hit it, called me for every decision, and kept the dust contained with plastic. Beautiful tile work."
- Dana Monroe"Redid two bathrooms at once. The crew protected the floors and cleaned up every single day before leaving. Quote was detailed and there were no mystery charges at the end."
- Tricia Dawson