







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub-to-Shower Conversion in Miami Beach, FL
A tub-to-shower conversion in Miami Beach typically runs $4,200 to $11,500, and most jobs are finished in three to five working days once materials are on site. It means pulling out an old tub (cast iron, fiberglass or acrylic) and replacing it with a walk-in shower base, tile walls and a new valve and trim – a change that matters a lot in a city where the average condo bathroom was built 40 to 60 years ago. If you’re stepping over a 14-inch tub apron every morning in a 1960s Miami Beach condo, or the tub itself has gone chalky from years of salt-humid air, this is the project we do most often. Call (844) 656-1986 and we’ll walk you through what your specific bathroom will need. This work is part of our larger Bathroom Remodeling service, so if you’re also replacing the vanity or flooring, it all happens in one visit.
Key Takeaways
- Most Miami Beach tub-to-shower conversions fall between $4,200 and $11,500 depending on tile, base type and drain relocation.
- We give you a written price before any demo starts – the number on day one matches the invoice.
- The 365-Day Done Right Promise covers the work for a full year; if something fails, we come back at no charge.
- Our technicians have up to 22 years of experience with the tile-over-cement-board method that holds up in South Florida humidity.

When You Need Tub-to-Shower Conversion
Some tubs fail slowly and some fail all at once. Here’s what we see most often in Miami Beach homes and condos:
- The tub is older than the rest of the bathroom. A 1970s cast-iron tub sitting under 1990s tile is a common find in Mid-Beach and South Beach buildings. The tub is fine; everything around it isn’t.
- Stepping over the apron has become risky. If a parent or grandparent lives with you, or you’ve had a knee or hip replaced, a 14-inch tub wall becomes a fall hazard. A curbless or low-threshold shower base solves it.
- The tub pan is flexing or cracking. Fiberglass tubs in Miami Beach condos often develop hairline cracks in the pan. Sometimes we can patch them; often the more sensible fix is a new base, because a patched flex crack comes back.
- You’re gaining a window or losing a window. Many Miami Beach bathrooms have a glass block or jalousie window over the tub. Converting to a shower lets you reset the tile waterproofing around that opening the right way, which is where leaks start.
- Water is showing up below the tub. If you see staining on the ceiling of the unit below, or soft spots in the floor next to the tub, the waterproofing has failed. This is the one to call about today – call (844) 656-1986 and we’ll come look.
- The showerhead and valve are on the wrong wall. Plenty of older Miami Beach layouts put the plumbing in an awkward spot. A conversion is the moment to move it, since the walls are open anyway.
Our Tub-to-Shower Conversion Process
We follow the same sequence on every job, whether it’s a small hall bath in Surfside or a master bath in North Beach. The order matters because it’s what keeps leaks from showing up six months later.
- Written price and arrival window. Before we touch a fixture, you get a written price and a defined arrival window. That’s the Kingswell standard we operate under – say the price before the work, show up in the window we gave, leave the place cleaner than we found it. You’ll know who’s coming, too: background-checked technicians in uniform.
- Demo and inspection. We pull the tub and the wall tile. At that point we check the substrate (the layer behind your tile that carries the waterproofing) and the drain. On older Miami Beach buildings we sometimes find a cast-iron drain line with corrosion inside, or a floor joist that’s taken on water. We show you what we find before we go any further.
- Rough plumbing and drain relocation. The shower valve (the mixing body inside the wall) goes in, and the drain moves to the center of the new shower footprint. If we’re relocating the drain to a different spot on the slab, that’s the part that adds a day and adds cost – we’ll tell you up front which it is.
- Waterproofing and a cement board substrate. We set cement board, tape and mud the seams, and apply a liquid or sheet waterproofing membrane over the whole wet area. In Miami Beach, this step matters more than in drier climates because the air holds moisture almost year-round. We don’t skip it and we don’t shortcut it with green drywall.
- Tile, base and trim. The shower base and drain go in, then wall tile, then the valve trim, showerhead and glass door. We use fixtures from brands with long track records – Kohler and Moen are the two we install most often, and both carry their own warranty alongside ours.
- Cleanup and the 365-Day Done Right Promise. We haul out every scrap and sweep up. And every conversion is covered by our 365-Day Done Right Promise: if something we installed fails inside the year, we come back and fix it at no charge.

Tub-to-Shower Conversion Pricing in Miami Beach
Here are the ranges we see in Miami Beach. Every project gets a written price before work starts, so what we quote is what you pay. These numbers are for the conversion itself, not a full bathroom remodel.
| Scope | Typical Range | What drives the number |
|---|---|---|
| Basic conversion, standard 30×60 shower, basic tile | $4,200 – $6,800 | Reusing the existing drain location; standard 12-inch or 24-inch wall tile; prefab base |
| Mid-range conversion, tile to the ceiling, frameless glass | $6,800 – $9,200 | Larger-format tile, glass door, Kohler or Moen valve upgrade |
| Full conversion with drain relocation | $8,500 – $11,500 | Moving the drain (often means opening the slab); moving the valve to a different wall |
| Curbless / low-threshold shower base | Add $1,200 – $2,800 | Slab work, recessed base, linear drain |
| Permit for structural or plumbing changes | $150 – $450 | Miami Beach building department fees; depends on the change |
What pushes the price up or down in Miami Beach
- Drain location. If the new shower drain lands where the old tub drain already is, you save real money. Moving it means cutting the slab or boxing out a floor – both add labor.
- Tile choice. A large-format porcelain tile is often cheaper to install than a small penny tile because there are fewer grout lines and fewer cuts. Slab or natural stone runs highest.
- What’s under the tub. Cast-iron drain lines in older Miami Beach buildings sometimes show enough corrosion that we recommend replacing a section while the floor is open. Costs more now; saves a re-do later.
- Condo rules. Many Miami Beach buildings require a permit for plumbing changes, and a growing number require proof of a licensed contractor before you touch a waterline. We handle the permit paperwork as part of the job.
- Glass. A frameless glass door adds $600 to $1,400 over a shower curtain rod or a framed door. It’s the upgrade most people ask for and the one most likely to be worth it.
We don’t charge for the estimate. You’ll get a written number you can hold us to, not a verbal ballpark that changes on demo day. For context on how a conversion fits into a larger bath update, see our guide to Bathroom Remodeling in Miami Beach.
Why Miami Beach Bathrooms Need a Different Approach
The climate here does real work on bathrooms. Miami Beach sits at sea level with salt air and year-round humidity in the 70s and 80s. That means two things: grout and caulk fail faster than they would inland, and the moisture finds any weak point in the waterproofing within a season or two. The conversion we install uses a full cement board substrate and a waterproofing membrane, not green-board and not a pre-formed plastic surround slapped over the old wall. That’s the difference between a shower that lasts 15 years and one that’s growing mold behind the tile in 18 months.
A good chunk of Miami Beach homes are also condos with concrete slabs between floors, which changes the job. On a slab, moving the drain means cutting concrete. In a wood-framed single-family home, it’s a different cut. We’ve worked in both across Mid-Beach, South Beach, North Beach, Surfside and the Sunset Islands – and we’ll tell you honestly which situation you’re in before we quote.
FAQs – Tub-to-Shower Conversion
How much does a tub-to-shower conversion cost in Miami Beach?
Most conversions in Miami Beach cost between $4,200 and $11,500, with the middle of the range landing around $7,000 to $8,500 for a standard 30-by-60 shower with tile and a glass door. The biggest variable is whether the drain moves. Call (844) 656-1986 for a free estimate – we’ll give you a written price before any work starts.
Can I convert my tub to a shower without moving the plumbing?
Yes, and it’s the cheaper route. If the new shower drain lands where the old tub drain sits, we can usually do the whole job without opening the floor. The valve can also stay on the same wall in most cases. We’ll tell you at the estimate whether your layout allows it.
Do I need a permit for a tub-to-shower conversion in Miami Beach?
In most cases, yes – any change to the drain or the shower valve counts as plumbing work, and Miami Beach’s building department requires a permit for that. Cosmetic-only changes (swapping a surround without moving plumbing) sometimes don’t. We pull the permit as part of the job and walk you through what’s required; permit costs typically add $150 to $450.
How long does a tub-to-shower conversion take?
Three to five working days for most conversions, once materials are on site. Drain relocation adds a day. Custom glass can add a second trip for measurement and install, which we schedule around your live-in window. Call (844) 656-1986 and we’ll give you a real start-and-finish window before you commit.
Ready to Trade the Tub for a Shower?
If you’re in Miami Beach and thinking about a tub-to-shower conversion, the easiest first step is a phone call. We’ll come out, look at the bathroom, and hand you a written price. If you want to see how a conversion fits together with the rest of the room, start with our Bathroom Remodeling page. Call (844) 656-1986 for a free estimate. A live person answers, day or night.
Written by the team at Penhallow Remodeling Miami Beach, serving Miami Beach.


