







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterFull Bathroom Remodeling in Miami Beach, FL
A full bathroom remodeling in Miami Beach typically runs $22,000 to $65,000, depending on how far down to the studs you go, whether the layout changes, and what finish level you choose. That number covers demo, rough-in, tile, fixtures, cabinetry and finish work, and you get it in writing before anyone lifts a pry bar. Full-gut remodels are for bathrooms that have stopped working for you: cracked shower pans, dated layouts, moisture damage you can smell before you see it, or a 1970s footprint that fights you every morning.
We connect Miami Beach homeowners with independent local professionals who do this work every week in this city, and we put the price and the guarantee in writing first. You can reach a live person 24/7 at (844) 656-1986. Our technicians have up to 22 years of experience, they’re background-checked, and they show up in uniform. If you’re comparing scope options, start with our Bathroom Remodeling page and drill into the full remodel from there.

Key Takeaways
- Full bathroom remodels in Miami Beach usually land between $22,000 and $65,000, and the written price you get on day one is the number on the invoice.
- Salt air and summer humidity are the two biggest reasons Miami Beach bathrooms fail early – the materials we use are chosen partly around that.
- Every project carries the 365-Day Done Right Promise in writing: if the work fails inside the year, we come back and make it right at no charge.
- A live person answers the phone 24/7 – no voicemail maze, no callback window.
When You Need Full Bathroom Remodeling
A full remodel earns its cost when the problems are structural or spatial rather than cosmetic. In Miami Beach, we see these situations often enough that they’re almost routine:
- The shower pan is leaking and you can’t find the source. In older Mid-Beach and South Beach condos, water that migrates under tile often shows up as a soft spot on the ceiling of the unit below before it shows up in your bathroom. Once the pan has failed, patching it usually just delays the call.
- You’re seeing mold or a musty smell that comes back after cleaning. Beachside humidity finds its way behind tile and into wall cavities where paint can’t reach it. That’s a substrate problem, not a surface one.
- The layout fights you every day. A door that swings into the vanity, a tub you never use taking up half the room, a toilet wedged against the wall. Changing the footprint is a full remodel by definition.
- Your fixtures are past their service life. Original 1980s or 1990s plumbing, single-pane windows fogging over, an exhaust fan that moves almost no air. Each one is a small problem that adds up to a whole-room rebuild.
- You’re selling or renting and the bathroom is the weakest room in the unit. In Miami Beach’s condo market, a dated bathroom shows up on every listing photo. A finished remodel changes how buyers read the whole unit.
- You want a walk-in shower, a curbless entry, or grab bars installed correctly. Aging-in-place retrofits are structural work, not accessories. They belong inside a full remodel, not bolted onto a finished bath.

Our Full Bathroom Remodeling Process
The Kingswell Way is simple: say the price before the work, show up in the window we gave, leave the place cleaner than we found it. That’s the spine of every project, and it looks like this on a full bath:
- Written price and scope. We measure, walk the room with you, and hand you a written price before any work starts. Not a ballpark. Not a range that moves after demo. A number in writing you can hold us to, itemized by demo, rough-in, tile, fixtures and finish.
- Defined arrival window and protection. We give you a start date and an arrival window, and the crew protects floors and hallways on the way in. Background-checked technicians in uniform on every visit – you know who’s walking through your door.
- Demo and substrate work. This is where the honesty matters. We open the walls and check what’s actually there. Cement board substrate (the moisture-resistant layer behind your tile) and proper waterproofing go in before a single tile is set, because in this climate that layer is what keeps the remodel from failing in two years.
- Rough-in and inspection. Plumbing and electrical get moved and brought up to current code with the permit pulled in your name. We don’t skip this step to save a week – shortcuts here are what show up as cracks and leaks later.
- Tile, cabinetry, and fixtures. We install recognized trade brands so the products behind our guarantee are as solid as the promise: KraftMaid and Wellborn cabinetry, Kohler and Moen fixtures, Cambria quartz or Silestone tops where you want stone, and waterproof board like CertainTeed or James Hardie where the wet wall needs it.
- Final walk and the 365-Day Done Right Promise. We walk the finished room with you, fix what needs fixing before we leave, and hand over the written guarantee. If the work fails inside the year, we come back and make it right at no charge – and there’s no service call or re-inspection fee on the return visit.
Full Bathroom Remodeling Pricing in Miami Beach
Here’s how the numbers break down for a typical full-gut bathroom remodel in Miami Beach. Your exact figure depends on the room, the condition under the tile, and the finish level you pick – but these are real ranges, not a hedge.
| Line item | Typical range | What moves the number |
|---|---|---|
| Demo & haul-away | $1,800 – $4,200 | Tile-over-tile, cast-iron tub removal, condo freight-elevator rules |
| Plumbing & electrical rough-in | $3,500 – $9,000 | Whether the layout moves, age of the supply lines, panel upgrades |
| Waterproofing & substrate | $1,500 – $4,000 | Cement board vs. foam board, pan build, wet-wall extent |
| Tile & stone | $4,000 – $14,000 | Porcelain vs. natural stone, pattern complexity, floor-to-ceiling coverage |
| Cabinetry & vanity top | $2,500 – $8,500 | Stock vs. KraftMaid or Wellborn semi-custom, quartz vs. laminate |
| Fixtures (shower, toilet, faucets) | $1,800 – $6,500 | Kohler/Moen vs. builder-grade, rain heads, body sprays |
| Labor (install & finish) | $5,000 – $14,000 | Room size, layout changes, trim detail |
What pushes the total up: moving the toilet or shower drain across the slab, adding a second shower head, upgrading to a curbless entry, replacing a fogged window, or discovering water damage under an old pan. What holds it down: keeping the existing footprint, choosing porcelain tile over natural stone, and using a stock vanity line instead of semi-custom.
Penhallow gives you a free estimate and a written price before any work starts. The number on day one is the number on the invoice. If you’re still deciding between a light refresh and a full rebuild, our Bathroom Remodeling in Miami Beach overview lays out the difference, and you can go back to the home page for the rest of our services.
Why does the price in Miami Beach run higher than what a contractor quotes me over the phone?
A phone ballpark usually ignores what’s under the tile and what the building requires. Miami Beach condos often add freight-elevator scheduling, protection of common areas, and hurricane-rated window or vent work that an out-of-town quote doesn’t account for. We put the real number in writing up front so it doesn’t surprise you at demo.
FAQs – Full Bathroom Remodeling
How much does a full bathroom remodel cost in Miami Beach?
A full bathroom remodel in Miami Beach typically costs $22,000 to $65,000. A mid-range full-gut bath with porcelain tile, a stock vanity and standard Kohler or Moen fixtures usually lands near the lower end; a larger primary bath with a layout change, custom cabinetry and stone tile moves toward the top. Call (844) 656-1986 for an exact written quote – estimates are free.
How long does a full bathroom remodel take?
A full bathroom remodel usually takes 4 to 8 weeks from demo to final walk in Miami Beach. Weather, permit timing, and material lead times on custom cabinetry drive the range. We give you a start date and an arrival window up front so you’re not guessing, and the written guarantee covers the finished work whenever it lands inside that window.
Do I need a permit for a full bathroom remodel in Miami Beach?
Yes – any full bathroom remodel that moves plumbing or electrical requires a permit in Miami Beach, and most condos also require board approval and protection of common areas. We handle pulling the permit in your name and walk the inspection with you. Doing this part right is what keeps a future buyer’s inspection from finding a surprise.
What is the 365-Day Done Right Promise?
The 365-Day Done Right Promise means if the work fails inside a year of completion, we come back and make it right at no charge. It’s backed in writing on every project, alongside our written guarantee on every repair and the free return visit if something fails – no service call or re-inspection fee, ever. Call (844) 656-1986 and we’ll walk you through exactly what’s covered.
Can you help me choose materials that hold up to Miami Beach humidity?
Yes. We pick products around this climate specifically – porcelain tile over porous stone in wet areas, cement board and waterproof board as the substrate, Moen and Kohler fixtures built for hard water and salt air, and cabinetry lines like KraftMaid and Wellborn that stand up to moisture swings. We’ll show you the difference between finish levels so the price you pay matches the life you get out of the room.
Will the crew arrive when they say they will?
Yes – a real arrival window is part of The Kingswell Way, and we don’t start a job without giving you one. Every technician is background-checked and comes in uniform, so you know exactly who’s in your home. If a day shifts, you hear it from us first, not the other way around.
Ready to get a real number on your Miami Beach bathroom? Call Penhallow Remodeling Miami Beach at (844) 656-1986 for a free estimate. You’ll get a written price, a defined arrival window, background-checked technicians in uniform, and the 365-Day Done Right Promise on the finished work – the same standard on every job, every time.
Written by the team at Penhallow Remodeling Miami Beach, serving Miami Beach.


